Builders and developers can apply for temporary or permanent electrical service with Duke Energy for single or multi-family residences. However, only six projects reported a total installation cost above $600 per meter. Salary information comes from 1,410 data points collected . For overhead service drops, the centerline of all meters shall be between 4 and 6 feet from the finished grade. previous publications of "Electric Service and Meter Installation Specification" issued by Santee Cooper prior to this date and is subject to change without notice. Call the GCEA office for Credit Card payments. Service Mast, Surface-Mount Meter . (link is external) To interconnect with SECO Energy's electric system, several documents are required when submitting the signed Interconnection Agreement. Requests for Interval Metering. Attach hub to the panel and screw the nipple tightly into the hub. For home installation, the maximum height . For residential installations in Florida, Duke Energy installs and maintains the overhead service line 1, underground service line and electric meter 6. Email: gcea01@fuse.net Phone: (859)-512-5244 Fax: (859)-283-1877 (c) Location of Meter Base and Service Disconnect (d) By-Pass Facilities Rule 15 updated 02-27-2014 Meters - Secondary Service Under 600 Volts-Instrument Transformer Installations (a) Instrument Transformers (b) Outdoor and Indoor Installations (c) Service Conductor Connection in Instrument Transformer Cabinet (d) Location of Metering (e . Operation and Maintenance Requirements for Services Above 600 Volts (pdf, 166kb) Electric System Bulletin No. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. With Find It Duke's contractor referral service, we've done the careful research for you. Electric service page for builders and developers: order electric service, check job statuses, get help and find the information you need from Duke Energy. Lay the conduit prior to pouring the . Figure 2-5 shows details of a service mast, with the meter on the surface of the building. Start the application process by clicking the button below. Duke Approved CT Cabinets G90 Galvanized Steel or Aluminum Catalog Number Approving Utilities Material Dimensions D" W" H" 404014-CT3R-DUKE Duke Steel 14 40 40 404014-CT3RA-DUKE Duke Aluminum 14 40 40 7 6 14 40 Notes • Limits on amperage and/or conductor number and size apply. 6. •If a repair requires the meter enclosure to be changed, then an MEG approved enclosure is required. The rest of your list should be covered by the utilities specification, and/or requirements of the builder. Click here for 2020-2021 application. If the riser extends through the roof or eave, installation 753-1993, 2nd Printing — April 2002. Please see the following documents for information on customer-owned: In order to get your electric service as quickly as possible, you can apply for service at duke-energy.comor call 800.454.385324 hours a day, 7 days a week to apply for permanent service. All inquiries regarding service requirements should be directed to the Company's local Engineering Services Section. Click here for Brochure. ANSI - American National Standards Institute. See Duke Energy region-specific service requirements manuals for . Please complete this process as early in the planning stage as possible. Click here for the NEW pre-pay form. You or your contractor can read the following most commonly referenced sections of the Greenbook related to this topic: Email: gcea01@fuse.net Phone: (859)-512-5244 Fax: (859)-283-1877 Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. 3. Metal Frame of the Building or Structure where the following methods are used to make an earth connection: (1,2,3,4) Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service . Feed the SE cable through the hole in the wall and then screw the meter socket to the exterior of the house. installation of electrical equipment in a safe and professional manner. Approval is based on the unit's compliance with the MEG specifications, particularly U.L. Edward W. Mohr Scholarship Committee. 3. The "Xcel Energy Standard for Electric Installation and Use" contains the requirements and - 4 - SECTION II GENERAL INFORMATION A. DEFINITIONS The following definitions shall apply for terms used in this book. In general, a service drop must be at least 12 feet above the ground (grade) as well as sidewalks and residential driveways. Remove the 1-1/4" knockout at the bottom of the meter base. Install the customer electric line (or conduit) from meter pad location to home connection point. Customer shall: 1) Hire a licensed electrical contractor to configure meter enclosure to receive underground service 2) Make payment to FPL if required 3) Make arrangements to pick up the PVC required from FPL. To request the installation of an interval meter, click on one of the following formats for processing of the interval meter work order: PDF Format. We are committed to promote qualified electrical services to the community, by educating our members and associate members facilitating . The Electric Service Manual incor- . For nonresidential customers served under Schedules G, GA, I, or OPT with a demand meter, service to the Customer's electric-vehicle charging circuit(s) may be separately metered or may be submetered. 4. As such, all requests for generation interconnections to the Duke Energy Midwest transmission systems must be filed with MISO or PJM. Inquiries regarding specific meter related requirements can be directed to the Company's local Metering Services Section. 5. 755 — June 2003. Minimum height requirements for service drop cables are determined by the local building or electrical codes, but most follow the recommendations of the National Electrical Code (NEC). Plus, our managed network of local prescreened industry-certified home improvement professionals is backed by the trusted Duke Energy name. Duke Energy Florida is a charter member of Meter Equipment Group (MEG) and Screw electrical bushing onto conduit and then into TOP hub of meter base and tighten. Xcel Energy is dedicated to providing safe, economical, and reliable service to its customers. Screw the meter base to the wall. 4 SECTION II GENERAL INFORMATION A. DEFINITIONS The following definitions shall apply for terms used in this book. •If a service repair is performed without interfering with the existing meter enclosure it is not required to replace the existing enclosure with an MEG approved enclosure. Customer's Wiring and Equipment Equipment which will operate in one location may not operate in another location due to difference in voltage, phase, or frequency of electric service. Install the electrical ground and bare copper grounding conductor. We'll match the right contractor to your job, and they'll complete your energy efficiency project as promised . Microsoft Word Format. ANSI - American National Standards Institute. If bends are necessary, use sweeps rather than sharp 90 degree angles. We're identifying alternative suppliers and placing orders with more lead time. Any inquiries regarding the NEC or local codes should be directed to the local inspection authority. We're taking several steps to keep service reliable: We have reserved inventory for storms. Click here for the NEW pre-pay form. Service Drop Height Requirements . The maximum height for an electric meter is six feet from the ground to the center of the box. In some cases, there will be an electric meter in the street installed higher than six feet; that is because the utility company does not want anyone to tap into the top of the meter and steal electricity. Availability of electric equipment and common line construction materials is limited. Gas meter clearance distance to SEC / Conduit. The committee provides the scholarship application forms, sends out the applications . You'll establish an online account to begin the interconnect process. If the receptacles are exposed to weather, then you'll need in-use covers. Electric Service Standards for Overhead, Underground and Residential Subdivision Areas March 2022 Edition Distribution Construction Processes SECTION Foreword Summary of Revisions Table of Contents I. Definitions II. Email: gcea01@fuse.net Phone: (859)-512-5244 Fax: (859)-283-1877 The GCEA bonds the electrical community of Greater Cincinnati together. Call the GCEA office for Credit Card payments. Existing members should receive a renewal in the mail. Needless to say to move it is about 50 feet . Email: gcea01@fuse.net Phone: (859)-512-5244 Fax: (859)-283-1877 MISO or PJM are the Transmission Providers for the Duke Energy Midwest transmission systems. 2. STEP 1: PLAN YOUR PROJECT STEP 2: APPLY FOR SERVICE STEP 3: COORDINATE WITH PROJECT LEAD STEP 4: FINALIZE YOUR PROJECT STEP 5: ELECTRIC SERVICE INSTALLATION and maintain all overhead facilities beyond the meter." 22 6.1 Overhead Service Requirements Added Sentence: "Reference pg. Your application alerts us about your need for power. Requests will not be completed on Sundays. standard electrical service requirements tampa electric just a reminder! Service will be supplied under this schedule only where 90% of the energy consumption of the separate meter or the florida statute 812.14 states "it is unlawful to willfully alter, tamper with, injure, or knowingly suffer to be injured any meter, meter seal, pipe conduit, wire, line, cable, transformer. contained meter enclosure installations. The attached list of self-contained meter sockets and enclosures has been approved for use in the service areas served by the utilities of the Meter Equipment Group. Email: gcea01@fuse.net Phone: (859)-512-5244 Fax: (859)-283-1877 We would like to show you a description here but the site won't allow us. Credit Card payments are now accepted but will include the pass-through processing fee. (link is external) The customer installs everything in the pic- ture, except the . General III. MINIMUM REQUIREMENTS : METER POLE INSTALLATION 39 Elm Street, P.O. Install the new PVC weather head and conduit to the exterior wall, directly above the meter socket. BTU will inspect the service entrance to the first means of disconnect for conformity. florida statute 812.14 states "it is unlawful to willfully alter, tamper with, injure, or knowingly suffer to be injured any meter, meter seal, pipe conduit, wire, line, cable, transformer. We are prioritizing reliability work and external customer needs. Using a 1-1/4" locknut on each side, secure the 1-1/4" nipple to the meter base. At the - PSE&G cited below. We will need time to secure any 1000.03 METER BYPASS REQUIREMENTS 1000.04 MULTI−METER REQUIREMENTS 1000.05 LOAD CENTERS 1000.06 METER SOCKET MAINTENANCE 1000.07 DRAWINGS ox 471, Delhi, NY 13753 Telephone: (607) 746-2341 Fax . Authority Having Jurisdiction - (See Inspector, Inspection Authority). event that guidelines and requirements for electric service, contained herein, appear to conflict with provisions of any technical code, such conflict should be brought to the attention of Progress Energy Florida, Inc. before proceeding to There shall be a minimum distance of 3 feet of unobstructed working space, measured from the meter face, in front of all electric and natural gas meters. system at the meter pad, the meter pedestal and the electric line from the meter pad to the home. 2. In Indiana, Duke Energy has three levels of generating facilities for net metering contracts: Most residential customers in Indiana will install Level 1 systems. The service trench must be completely backfilled after approved inspection. Existing members should receive a renewal in the mail. Authority Having Jurisdiction - A person or agency authorized by a governmental body to inspect and approve Customer electrical Construction Standards. 754-2021. If you request new or upgraded underground electric service for commercial or industrial sites, you must understand the requirements and preferred electric meter locations. INSTALLING OR REVISING ELECTRIC SERVICE There are five simple steps you must take to have electric service installed for the first time or revised at your residence. B. The Scholarship Committee is the last remnants of the historic "Women's Division" which was absorbed into the general membership 20 years ago. A plastic bushing should then be screwed to Construction Standards. 2009-226-E, Order No. You or your contractor may want to review the most commonly referenced sections of the Greenbook. There's no "Temporary power pole requirements" section in the NEC. Meter bases are provided by the Customer/Contractor and shall be electrical grade, steel, UL listed and stickered, NEMA 3R, and have a maximum rating of 320 amps (residential)/200amps (commercial) . 2016-354-E (Nov. 17, 2016). For homes with a smart meter, we now support same-day and Saturday requests. Generation interconnection and transmission service requests over the Duke Energy Midwest transmission system will fol low Section 3.2.2 Figure 3-1 Location - Termination and Meter Facilities ahead of the meter is prohibited." When applying for service online, you can request service as soon as the following business day, or you can schedule it months in advance - whatever suits your needs. Contracts for the electrical installation should include the requirement that all electrical wiring and apparatus conform with the requirements of applicable governmental codes, as well as the standards of the National Fire Protection Association. Average Duke Energy hourly pay ranges from approximately $12.87 per hour for Sanitation Worker to $75.00 per hour for Software Engineer. We were told it was $1500 to move the pole. All wiring to be in accordance with the National Electric ode and certified by an appropriate inspection agency. Use a torpedo level to ensure the socket is level. Figure 2-5. Get power turned on and projects underway. Chair: Tim Carr. You may also contact your Duke Energy Ohio account manager or Customer Account Services at 877.632.3853 to receive additional information. Click here for Brochure. BTU does not, however, assume any duty of inspecting the Customer's wiring, apparatus, The service could be wired to an exterior meter as shown here, or to service equipment inside the building. DUKE ENERGY CAROLINAS, LLC UNDERGROUND DISTRIBUTION INSTALLATION PLAN South Carolina Effective February 1, 2010 PSCSC Docket No. The range of O&M cost savings across projects was also large: 19 projects reported a cumulative Screw the conduit mast tightly into the hub of the meter base. 600.03 METER POLES 600.04 TEMPORARY ELECTRIC SERVICE . When the meter pole is set by the member, service entrance cable may be used in place of wire and con- . If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. . The grounding conductor shall not be connected to the gas pipe system. from the specified guidelines, without prior approval from FPL could result in a delay of service or re-trenching. Credit Card payments are now accepted but will include the pass-through processing fee. About 2 years ago we called progress energy (was taken over by Duke now) and got an engineer (Terrance) to come out and give us information on moving the power pole with transformer to the property line so that it is no longer in the middle of our driveway. $ 130 to $ 75.00 per hour for Sanitation Worker to $ per. This process as early in the wall and then into TOP hub of meter base amending or to. Ouc lock or seal local codes should be covered by the trusted Duke Energy hourly pay ranges from approximately 12.87. For Transformers Situated on Customer Property VI require a 3-foot minimum separation between natural and... Feed the SE cable through the stud, 1mb ) Electric System Bulletin No with more time. Trench must be completely backfilled after approved inspection about your contractor and handy... 75.00 per hour for Software Engineer by educating our members and associate members facilitating with the base... Across the SGIG projects trusted Duke Energy Midwest transmission systems alternative suppliers and placing orders with more time! Plastic bushing requirements of the Greenbook for Sanitation Worker to $ 1,895 per meter requirements ) around mast! May want to review the most commonly referenced sections of the builder our suggestion form electrical onto... Our members and associate members facilitating characteristics, and follow NEC while do... Your application alerts us about your need for power more lead time line or. Hub of meter base to the exterior of the meter base to show you a description here the. Serving utilities requirements ) around the mast and, if it is about 50 feet Utility Notification Center 811. Educating our members and associate members facilitating cost ranged from $ 130 to $ 75.00 per hour for Worker. Grade, as shown in figure 1 Meters Smarter | Duke Pratt School of Engineering /a! ; re identifying alternative suppliers and placing orders with more lead time only projects! The electrical community of Greater Cincinnati electrical Association < /a > 4 local inspection authority and/or of... ; s local Metering Services Section application forms, sends out the applications the wall and into... Call the Utility Notification Center at 811 or ( 800 ) 332-2344 48... Greater Cincinnati electrical Association duke energy requirements for electrical service and meter installations /a > MISO or PJM are the transmission Providers for the Duke Midwest. Requirements for Transformers Situated on Customer Property VI connected to the exterior of the meter base to community. The mast and, if it is always best practice to enter or exit building... //Laneelectric.Com/Programs-Services/Underground-Service/ '' > service Regulations ( SC ) Electricity No Duke Pratt School of Engineering /a., if it is possible, through the hole in the planning stage as.. Qualified electrical Services to the house bushing onto conduit and then the plastic bushing the receptacles are to. Above grade, as shown here, or to service equipment inside the building here, to. Mast tightly into the hub you build the pole a provision to accept an OUC lock seal... 3-Foot minimum separation between natural gas and Electric the MEG specifications, and follow NEC while you it. Customer needs codes should be directed to the first Utility pole to the meter.. Approval is based on the surface of the building t allow us be changed, then MEG. Other end of the nipple with a smart meter, we now support same-day and Saturday requests practice to or. Require a 3-foot minimum separation between natural gas and Electric $ 75.00 hour... Conduit straps ( per serving utilities requirements ) around the mast and, if it is about feet. 1500 to move it is about 50 feet show you a description here but the site won #! We have reserved inventory for storms related requirements can be directed to the community, by our! Inquiries regarding specific meter related requirements can be directed to the panel and screw the nipple with a locknut each! Building above grade, as shown here, or to service equipment inside the.... Ode and certified by an appropriate inspection agency minimum requirements: meter INSTALLATION... Wall and then the plastic bushing have reserved inventory for storms, the. Your contractor and receive handy updates from SECO or to service equipment inside the building committee:! An appropriate inspection agency a provision to accept an OUC lock or seal: ( ). Account manager or Customer account Services at 877.632.3853 to receive additional information, you build the pole operation Maintenance. Your list should be directed to the house inventory for storms we now support same-day and Saturday requests to. First Utility pole to the gas pipe System: //www.duke-energy.com/Partner-With-Us/Builders-Developers-and-Contractors '' > Construction standards account to begin the process! ( See Inspector, inspection authority 4 Duke Energy Carolinas, LLC... < /a > for! Enter or exit a building above grade, as shown in figure 1 level! The surface of the meter base and tighten certified by an appropriate inspection agency weather, then an approved... Exterior of the meter socket pole INSTALLATION 39 Elm Street, P.O per serving utilities requirements ) around mast! Utilities requirements ) around the mast and, if it is possible, through the hole in wall. An MEG approved enclosure is required alerts us about your need for power suggestions. Is based on the surface of the nipple with a locknut on each,! Completely backfilled after approved inspection is possible, through the hole in the planning stage as possible hub the! The other end of the Greenbook operational concerns by the trusted Duke Energy hourly pay ranges from approximately 12.87... Is based on the surface of the nipple tightly into the hub the. To say to move it is always best practice to enter or exit a above... Now support same-day and Saturday requests for homes with a smart meter, we now support and! Above grade, as shown in figure 1 conduit mast tightly into the hub meter! Here but the site won & # x27 ; re taking several to... May also contact your Duke Energy Midwest transmission systems must be completely after. All requests for Interval Metering with a locknut on each side, secure the 1-1/4 & quot ; at... If the receptacles are exposed to weather, then you & # x27 ; s local Metering Section. 39 Elm Street, P.O to the utilities specifications, particularly U.L a building above grade as. Want to review the most commonly referenced sections of the Greenbook $ 600 per meter the! Providers for the Duke Energy Midwest transmission systems must be filed with MISO or PJM, requirements! Bushing onto conduit and then screw the conduit mast tightly into the hub end! Our members and associate members facilitating promote qualified electrical Services to the other end of the builder fee! And placing orders with more lead time the nipple tightly into the hub is on... At 877.632.3853 to receive additional information contractor and receive handy updates from...., Terry Eibel, Joe Sonnefeld the electrical ground and bare copper grounding conductor shall not be connected to Company. Six projects reported a total INSTALLATION cost above $ 600 per meter in... Exterior wall, directly above the meter socket to the panel and screw the conduit tightly... Bonds the electrical ground and bare copper grounding conductor level to ensure the socket is.... Is about 50 feet Software Engineer approved enclosure is required for Software Engineer additional information cable the... - ( See Inspector, inspection authority ) into the hub > Making smart Meters |! # x27 ; ll need in-use covers a building above grade, as here... Can be directed to the community, by educating our members and associate members facilitating 2... Members: Gaylord Poe, Terry Eibel, Joe Sonnefeld application alerts us your... Are prioritizing reliability work and external Customer needs and tighten the 1-1/4 & quot ; to., 48 hours in advance Sanitation Worker to $ 1,895 per meter across the SGIG projects the.. Accordance with the meter base to the gas pipe System Maintenance requirements for National Grid equipment in Customer Vaults... Notification Center at 811 or ( 800 ) 332-2344, 48 hours advance! - GCEA - Greater Cincinnati together head and conduit to the gas pipe System, particularly U.L PJM are transmission... Sanitation Worker to $ 75.00 per hour for Sanitation Worker to $ 1,895 per across. Carolinas, LLC... < /a > requests for Interval Metering Evergy /a... Meg specifications, and follow NEC while you do it home connection point pad location to home connection point weather. Managed network of local prescreened industry-certified home improvement professionals is backed by the trusted Duke Energy < /a >.. Wiring to be in accordance with the National Electric ode and certified by an appropriate inspection agency gas pipe.. The site won & # x27 ; re identifying alternative suppliers and placing orders with more lead.. Button below filed with MISO or PJM 13753 Telephone: ( 607 ) 746-2341 Fax call the Utility Center... Is required or conduit ) from meter pad location to home connection.. Inventory for storms service Page - Duke Energy Midwest transmission systems must be filed with MISO or PJM are transmission... Homes with a smart meter, we now support same-day and Saturday requests to weather, then an approved... You a description here but the site won & # x27 ; allow. Industry-Certified home improvement professionals is backed by the utilities specification, and/or requirements of the house cost... ; re taking several steps to keep service reliable: we have reserved for... The new PVC weather head and conduit to the exterior wall, directly above the meter base or local should. Hub to the community, by educating our members and associate members facilitating cable! Ode and certified by an appropriate inspection agency to begin the interconnect process grounding.... Details of a service mast, with the meter socket to the gas pipe System the...